400 Tank Farm, Phase 1 Pipe Fabrication
Location: |
Edmonton, AB |
Description: |
Pipe fabrication for a 200,000 barrel capacity refinery tank farm |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
400 Tank Farm, Phase I
Location: |
Edmonton , AB |
Description: |
Construction of a new 200,000 barrel capacity refinery tank farm and the demolition of existing facilities |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Aurora Mine Project
Location: |
Fort McMurray, AB |
Description: |
30,000 BPD oil sands extraction facility |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Block 80 Cell Area Shutdown
Location: |
Fort Saskatchewan, AB |
Description: |
Petrochemical plant shutdown |
Built By: |
|
|
|
|
|
 |
Calgary Energy Centre
Location: |
Calgary, AB |
Description: |
250 MW combined cycle power plant |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Calgary Energy Centre Pipe Fabrication
Location: |
Calgary, AB |
Description: |
Pipe fabrication of approximately 30,000 units for a 250 MW combined cycle power plant |
Built By: |
PCL Industrial Constructors Inc. |
Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Chlorides Management Facilities
Location: |
Mildred Lake, AB |
Description: |
Installation of two new Inclined Plate Settlers (IPS) complete with ancillary work to tie the new units into the existing extraction process |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
CNRL Horizon Early Works
Location: |
Fort McKay, AB |
Description: |
Construction of a concrete structure for a delayed coker unit and a diluent recovery unit |
Built By: |
PCL Industrial Constructors Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
CNRL Horizon Oil Sands Project, Primary Upgrading Units
Location: |
Fort MacKay, AB |
Description: |
PCL, contracted to Technip Italy, is constructing the Delayed Coker and the Diluent Recovery Units of the Primary Upgrader. The completed and on-going work includes installation of temporary construction facilities, earth works, cast-in-place piling, deep and shallow undergrounds, cast-in-place and pre-cast concrete foundations, concrete paving, structural steel erection, building erection, heavy lifts, module installation, equipment installation, piping installation, insulation of major equipment, and construction of plant roads. |
Built By: |
PCL Industrial Constructors Inc. |
Delivery Method: |
[TB] Traditional Bid |
|
|
 |
CNRL Horizon Priority Works
Location: |
Fort McKay, AB |
Description: |
Deep undergrounds, pre-cast concrete erection, heavy lifts and coke drum steel erection of the temporary construction facilities for the primary upgrader (PUG) site |
Built By: |
PCL Industrial Constructors Inc. |
Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Consumers Co-op Process Modules
Location: |
Regina, SK |
Description: |
Fabrication and assembly of seven process modules |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Eight-Bed PSA Skid
Location: |
Nisku Fab Shop, AB |
Description: |
Fabrication and assembly of an 8-bed PSA skid
|
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Emerald Project - Module Fabrication
Location: |
Joffre, AB |
Description: |
Pipe fabrication for seven process modules |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Ethanol and Co-Products Plant
Location: |
Red Deer, AB |
Description: |
21-million litre/year ethanol production facility |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Fab 23 Cooling Water Systems
Location: |
Colorado Springs, CO |
Description: |
Stainless fabrication for microchip plant. |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Fab./Install Hibernia Topsides Wellhead Module Package
Location: |
Bull Arm, NF |
Description: |
Fixed oil drill and production platform. |
Built By: |
PCL-Aker Stord-Steen-Becker, A Joint Venture |
|
|
|
|
 |
General Mechanical
Location: |
Fort Saskatchewan, AB |
Description: |
Mechanical installations, contract coordination, pipe fabrication, piping installations, glycol tracing, steel erection and civil works in a live plant environment |
Built By: |
PCL Industrial Constructors Inc. |
Delivery Method: |
Traditional Bid [TB] |
|
|
 |
Hydrocarbon Liquids Conservation Modules
Location: |
Fort McMurray, AB |
Description: |
Assembly of 22 piperack modules |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Hydrocarbon Liquids Conservation Project
Location: |
Fort McMurray, AB |
Description: |
170,000 BPD NGL extraction facility |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Hydrocarbon Liquids Conservation Project Fabrication
Location: |
Nisku Fab Shop, AB |
Description: |
Pipe fabrication for a 170,000 BPD NGL extraction facility |
Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
| |
| 1 2 3 |