| 1 2 3 |
Search Results |
 |
400 Tank Farm, Phase 1 Pipe Fabrication
| Location: |
Edmonton, AB |
| Description: |
Pipe fabrication for a 200,000 barrel capacity refinery tank farm |
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
400 Tank Farm, Phase I
| Location: |
Edmonton , AB |
| Description: |
Construction of a new 200,000 barrel capacity refinery tank farm and the demolition of existing facilities |
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
AOSP Downstream Expansion - RHC Unit
| Location: |
Fort Saskatchewan, AB |
| Description: |
Construction of a Residue Hydro Conversion, Integrated Hydro Treatment Unit (RHC) which is the main process unit within the Shell Canada Alberta Oil Sands Project |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Aurora Mine Project
| Location: |
Fort McMurray, AB |
| Description: |
30,000 BPD oil sands extraction facility |
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Block 80 Cell Area Shutdown
| Location: |
Fort Saskatchewan, AB |
| Description: |
Petrochemical plant shutdown |
| Built By: |
|
|
|
|
|
 |
Calgary Energy Centre
| Location: |
Calgary, AB |
| Description: |
250 MW combined cycle power plant |
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Calgary Energy Centre Pipe Fabrication
| Location: |
Calgary, AB |
| Description: |
Pipe fabrication of approximately 30,000 units for a 250 MW combined cycle power plant |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Chlorides Management Facilities
| Location: |
Mildred Lake, AB |
| Description: |
Installation of two new Inclined Plate Settlers (IPS) complete with ancillary work to tie the new units into the existing extraction process |
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
CNRL Horizon Early Works
| Location: |
Fort McKay, AB |
| Description: |
Construction of a concrete structure for a delayed coker unit and a diluent recovery unit |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
Traditional Bid [TB] |
|
|
 |
CNRL Horizon Oil Sands Project, Primary Upgrading Units
| Location: |
Fort MacKay, AB |
| Description: |
PCL, contracted to Technip Italy, constructed the Delayed Coker and the Diluent Recovery Units of the Primary Upgrader. The work included installation of temporary construction facilities, earth works, cast-in-place piling, deep and shallow undergrounds, cast-in-place and pre-cast concrete foundations, concrete paving, structural steel erection, building erection, heavy lifts, module installation, equipment installation, piping installation, insulation of major equipment, and construction of plant roads. |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
CNRL Horizon Priority Works
| Location: |
Fort McKay, AB |
| Description: |
Deep undergrounds, pre-cast concrete erection, heavy lifts and coke drum steel erection of the temporary construction facilities for the primary upgrader (PUG) site |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Consumers Co-op Process Modules
| Location: |
Regina, SK |
| Description: |
Fabrication and assembly of seven process modules |
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Eight-Bed PSA Skid
| Location: |
Nisku Fab Shop, AB |
| Description: |
Fabrication and assembly of an 8-bed PSA skid
|
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Emerald Project - Module Fabrication
| Location: |
Joffre, AB |
| Description: |
Pipe fabrication for seven process modules |
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Ethanol and Co-Products Plant
| Location: |
Red Deer, AB |
| Description: |
21-million litre/year ethanol production facility |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Fab 23 Cooling Water Systems
| Location: |
Colorado Springs, CO |
| Description: |
Stainless fabrication for microchip plant. |
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Fab./Install Hibernia Topsides Wellhead Module Package
| Location: |
Bull Arm, NF |
| Description: |
Fixed oil drill and production platform. |
| Built By: |
PCL-Aker Stord-Steen-Becker, A Joint Venture |
|
|
|
|
 |
General Mechanical
| Location: |
Fort Saskatchewan, AB |
| Description: |
Mechanical installations, contract coordination, pipe fabrication, piping installations, glycol tracing, steel erection and civil works in a live plant environment |
| Built By: |
PCL Industrial Constructors Inc. |
| Delivery Method: |
[TB] Traditional Bid |
|
|
 |
Hydrocarbon Liquids Conservation Modules
| Location: |
Fort McMurray, AB |
| Description: |
Assembly of 22 piperack modules |
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
 |
Hydrocarbon Liquids Conservation Project
| Location: |
Fort McMurray, AB |
| Description: |
170,000 BPD NGL extraction facility |
| Built By: |
PCL Industrial Constructors Inc. |
|
|
|
|
| |
| 1 2 3 |