Project Features/Highlights
Total square footage 49,995 Gymnasiums 13,120 Seniors Programming 2,000 Youth Programming 2,000 Preschool Programming 3,150 Multi-Use Rooms 4,800 Administration 1,685 Service Spaces 1,980 General Public Spaces 11,260 Fitness Centre 10,000 Current Progress
Work Accomplished to June 30, 2008: · Structural steel erection is complete. Misc Metals, hand rails in progress • M&E work is continuing in the parkade, on the main floor, and at upper floor. • Masonry block work is complete in the gym and youth area and has commenced in the main floor washrooms area. Hollow-metal door and window frames are being installed in block work as required. • Spray fireproofing is substantially complete. • Insulated metal panels are installed on vertical faces, soffits to be completed. • Steel stud is complete in L1 and L2. Boarding and taping underway in L1 Admin/ Daycare area. Project Description
The Community Recreation Center will add 58,000SF of recreational facility space to the growing community of Abbotsford. It is adjacent to the existing Abbotsford Recreation Centre/Swimming Pool, and will tie in architecturally while adding much needed parking space to the community complex. It will provide additional gymnasiums, workout areas, senior, youth and children programming areas, as well as an elevated indoor running track. The building utilizes a Geothermal Well system to augment the heating/cooling to lower the Owner's operating costs. The exterior envelope uses Clayburn brick, which is produced near the historic Clayburn Factory nearby, thus adding value to Abbotsford's local economy.
|
Contact
Contact ProjectPhone: (604) 859-4996
Fax: (604) 859-4943
OwnerPrime ConsultantHughes Condon Marler Architects
|
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |