This project involves the supply and installation of the temporary construction facilities for the Primary Upgrader (PUG) Site, including: office trailers, lunch rooms, wash-cars, warehouse, site preparation of laydown and temporary roads and fencing.
Also included is the following:
- Supply of a heavy lift crane to install the 4 coker drums, structural steel and Derrick assemblies.
- Installation of approximately 1400 cast-in-place concrete piles
- Supply and installation of the sewer system as well as installing the firewater system complete with manholes
- Installation of the maze basin foundation and complete the site preparation including permanent roads and paving
- Supply of pre-cast concrete columns