Project Description
This project consisted of the assembly and installation of 104 modules, 23 bridges and 23 towers. The piperack modules and bridges were assembled in the PCL Industrial Constructors Inc. Module Assembly Facility in Nisku and shipped to site for installation in the operating plant andgreenfield area. Approximately 36 miles of pipe, insulation and heat trace tubing were installed by PCL Industrial's direct hire forces. Major subcontract work included insulation, electrical cable tray, heat tracing channel and electrical heat tracing installation.
|
Contact
For similar projects contact:OwnerNova Chemical/Bantrel Alliance
Prime ConsultantColt/Stone & Webster Joint Venture
|