|
|
|
|
|||||||||||||||||||||||
Project Description
This project consisted of the pipe fabrication for the Williams Energy Redwater site and three areas of the Fort McMurray site; Tube Storage, main plant and in plant (Suncor). A portion of the fabrication provided spools for 22 piperack modules and three equipment modules.
|
Contact
For similar projects contact:OwnerPrime Consultant |
| Site Design and Build by Impello Inc. | Copyright © 2005 PCL Constructors Inc. All rights reserved. |
| Our operations are carried out by a number of independent companies which operate in different construction markets and geographic areas. |